Loading...
Equipment source: ARIS

Irradiation facility with water activation loop at JSI TRIGA reactor

Purpose of equipment
The activated water irradiator on the TRIGA detector at the IJS will serve as a well-defined and stable source of high-energy characteristic gamma rays and neutrons. It will enable various experiments based on the water activation process, validation of computational methods, calibration of the detector, gamma spectrometry and dose field measurements, integral cross-section measurements, etc. It consists of various equipment: a) gamma and neutron detectors and corresponding measuring instruments, b) equipment for the water loop (pump, valves, flow metre), c) equipment for the control of the loop, d) production of specific custom-made products (concrete blocks - shielding, irradiation area, etc.).
Access of equipment
Responsible for equipment: PhD Luka Snoj
The irradiation facility with a water activation loop will be accessible in the reactor hall of JSI TRIGA the research reactor. The individual components are functional, but the entire facility has not yet been commissioned due to procurement, production delays, etc, which were much longer than first anticipated (COVID). The purchase/construction of the remaining equipment will be completed (or delivered) in 2023 (partially also within Paket21).
ARIS research and infrastructure programmes (1) Legend
no. Code Title Period Head No. of publicationsNo. of publications
1.  P2-0073  Reactor Physics  1/1/2020 - 12/31/2027  PhD Luka Snoj  3,340 
Organisations (1)
no. Code Research organisation City Registration number No. of publicationsNo. of publications
1.  0106  Jožef Stefan Institute  Ljubljana  5051606000  90,768 
Views history
Favourite