Loading...
Projects / Programmes source: ARIS

Energy - Ecology - Economy (E3)

Research activity

Code Science Field Subfield
2.02.09  Engineering sciences and technologies  Chemical engineering  Ecological technology 

Code Science Field
T350  Technological sciences  Chemical technology and engineering 
T270  Technological sciences  Environmental technology, pollution control 
Keywords
energy integration, water minimization, waste minimization, cleaner production, sugar
Evaluation (rules)
source: COBISS
Researchers (5)
no. Code Name and surname Research area Role Period No. of publicationsNo. of publications
1.  06008  PhD Andreja Goršek  Chemical engineering  Researcher  2002 - 2004  539 
2.  10878  PhD Anita Kovač-Kralj  Chemical engineering  Researcher  2002 - 2004  335 
3.  12496  Miro Mele  Plant production  Researcher  2002 - 2004  29 
4.  11369  PhD Zorka Novak Pintarič  Chemical engineering  Head  2002 - 2004  476 
5.  04009  PhD Severina Oreški  Chemical engineering  Researcher  2002 - 2004  83 
Organisations (1)
no. Code Research organisation City Registration number No. of publicationsNo. of publications
1.  0794  University of Maribor, Faculty of Chemistry and Chemical Engineering  Maribor  5089638012  13,112 
Abstract
The main goal of our project is use of integral approach to minimisation of material, energy consumption and waste production of the existing process (Sugar factory Ormož). Pinch analysis in integration and MINLP in simultaneous optimisation of the energy intensive process will be applied. Emphasis will be on reducing energy and water consumption and negative influences to environment respectively. It will be a case study of improving the efficiency in small and medium size enterprises, improving their market competitiveness and environmental sustanability. The objectives of the projects are in accordance with the current trends in industry (process industry consumes one third of all the energy) on one side, and with the needs for the development of computerized systems for process design on the other side. In this sence the co-ordination with partners from EU is already established in order to prepare a proposal for the Fifth Framework Programme.
Views history
Favourite