The revitalization of existing and designing of new micro and mini hydro power plants (from 100 up to 1000 kW) on the territory of south and southeastern Serbia

Research activity

Code Science Field
T140  Technological sciences  Energy research 
T210  Technological sciences  Mechanical engineering, hydraulics, vacuum technology, vibration and acoustic engineering 
Keywords
Micro and Mini Hydro Power Plant, Hydraulic turbine, Revitalization, Examination, Regulation
Organisations (2) , Researchers (2)
0104  University of Nis, Faculty of Mechanical Engineering
no. Code Name and surname Research area Role Period No. of publicationsNo. of publications
1.  09666  PhD Ksenija Ž. Denčić-Mihajlov  Economics, econometrics, economic theory, economic systems, economic policy  Researcher  2011  44 
0114  University of Nis, Faculty of Economics
no. Code Name and surname Research area Role Period No. of publicationsNo. of publications
1.  09664  PhD Vesna M. Sekulić  Economics, econometrics, economic theory, economic systems, economic policy  Researcher  2011 - 2019  23 
Abstract
Before and after the Second World War in Serbia were built a large number of small hydro power plants. A certain number of small hydro power plants are nowadays out of operation, because some vital objects are outdated, and production of energy became too expensive. On other operating small hydro power plants it is necessary to accomplish the revitalization as soon as possible in order to produce cheaper electric energy. Considering all it is necessary, in order to obtain an order in building small hydro power plants and to raise their power level and energy capability, to inspect and review certain existing objects and measure their operating parameters. In this way we could obtain a starting data which are necessary for the revitalization of the facility. For one, chosen object, it would be accomplish the revitalization of hydraulic turbine, and according to requirement, it would be designed a new one. The operating characteristics of the new turbine would be obtained by numerical simulations of fluid flow through the hydraulic turbine. Also, after installing the turbine at the small power plant, it would be measured operating characteristics of the turbine. Finally it would be performed an analysis of the justification for rebuilding this facility and it would be published data which refers to improvement of installed power of the small hydro power plant.