Loading...
Projects source: E-CRIS

Development, design and implementation of modern strategies of integrated management of operations and vehicle and mechanization maintenance in auto transport, mining and energy

Research activity

Code Science Field
P170  Natural sciences and mathematics  Computer science, numerical analysis, systems, control 
S188  Social sciences  Economics of development 
T003  Technological sciences  Transport technology 
T210  Technological sciences  Mechanical engineering, hydraulics, vacuum technology, vibration and acoustic engineering 
T340  Technological sciences  Mining 
Keywords
Vehicles, mechanization, operations, maintenance, ICT, environment.
Organisations (5) , Researchers (1)
0023  University of Belgrade, Faculty of Mechanical Engineering
no. Code Name and surname Research area Role Period No. of publicationsNo. of publications
1.  00452  Gradimir Ivanović  Mechanical engineering, hydraulics, vacuum technology, vibration and acoustic engineering  Head  2011 - 2019  74 
0112  University of Belgrade, Institute "Mihailo Pupin"
0173  University of Prishtina, Faculty of Natural Sciences and Mathematics
0217  Metropolitan University
0256  Innovation Center, Faculty of Mechanical Engineering in Belgrade Ltd (IC)
Abstract
Development, design and implementation of modern strategies of integrated management of operations and vehicle/mechanization maintenance in auto transport, mining and energy systems are based on the availability and reliability analyses together with techno-economic evaluation of production processes, vehicle and mechanization maintenance. The goal is to develop a software support to management systems with continually available data and information, relevant for process of optimization of correlative dependences between existing subsystems, technological and functional units in real time. Project defines modern strategies of integrated management, explores and develops possibilities of artificial intelligence and ICT implementation. Methodological approach is determined by the maximum of technical, economical, energy and ecology efficiency function. All processes and systems are being designed in accordance with EU criteria and are being viewed from the point of the impact on environment, and with this aspect, as condition and limit, equal to techno-economic ones incorporated into management model. Theoretical and methodological improvements are tested and proved through the modeled practical examples. The idea is to avoid accidents and increase benefits facilitated by systematic monitoring and prediction, the implementation of modern strategies and integral management of resources and processes in industrial giants, such as auto transport, mining and energy systems.
Views history
Favourite