RESEARCHING AND MONITORING CHANGES IN STRESS-DEFORMATION CONDITION OF ROCK MASSIF “IN-SITU” AROUND UNDERGROUND FACILITIES WITH DEVELOPMENT OF MODEL WITH SPECIAL EMPHASIS ON KRIVELJ RIVER TUNNEL AND BOR PIT

Research activity

Code Science Field
T340  Technological sciences  Mining 
Keywords
stress conditions, tunnel, ore body, support, transmiter
Organisations (3) , Researchers (7)
0122  Institute for Mining and Metallurgy
no. Code Name and surname Research area Role Period No. of publicationsNo. of publications
1.  12333  Lidija V. Đurđevac Ignjatović  Mining  Researcher  2011 - 2019 
2.  12332  Dragan N. Ignjatović  Mining  Researcher  2011 - 2019  11 
3.  12269  MSc Slađana D. Krstić  Geology, physical geography  Researcher  2011 - 2019  12 
4.  12286  PhD Daniel P. Kržanović  Mining  Researcher  2011 - 2019  52 
5.  12295  Bojan A. Radović  Chemistry  Researcher  2018 - 2019  10 
6.  12288  Miloš P. Stojanović  Mining  Researcher  2019 
7.  12334  Dušan Đ. Tašić  Mining  Researcher  2011 - 2019  19 
0031  University of Belgrade, Faculty of Mining and Geology
0032  University of Belgrade, Technical Faculty
Abstract
Among the most important activities in the RTB Bor in the future, from aspects of ecology and ore exploitation, is building a Krivelj river tunnel and exploitation of the rich ore body "T" from the Bor pit. The aim of this project is to win the numerical methods for determination of real stress-deformation state of the rock massif around the Krivelj river tunnel, whose length is 2.400m, and it partially goes below flotation tailings. Second part of the project is related to the ore body "T", i.e. defining the stress-deformation condition around large underground stope, with cross-section of approximately 2200 m2, and volume of 80,000 m3. In both listed buildings, in their support system should be put proper equipment for monitoring changes in stress-deformation condition. These results should be used for improvement of numerical methods for stress-deformation analysis. Krivelj river tunnel’s task is to collect water from the old river bed. On the projected route will be performed researches for determination of engineering geological characteristics of the new tunnel route and physical-mechanical and deformation tests of rock from tunnel route. Second task of this project is monitoring introduction during exploitation of the ore body "T" in accepted mining method with open stope and with support of cavity. The stability of the entire production system shall be taken care of on this way and suggestions about ore exploitation shall be given.